
Holmen Fjordhotell
Celsius Service delivered the Tequs installation at Holmen Fjordhotell, a 170-room hotel, supplying space heating and hot water demand.
- Location
- Norway
- Installed capacity
- 140 kW (Aqua4)
- Facility size
- 170 rooms
- Energy saved
- ~191,000 kWh/yr
Technical solution & results
ParameterDetail
- Heat pump model
- Aqua4
- Refrigerant
- CO₂ (R744)
- Application
- Space heating and domestic hot water for a hotel
- Status
- To be commissioned, expected Q4 2026
Results & impact
~191,000 kWh/yr Energy savings against prior heating costs
References.
Public buildingsAdO Arena
Cut district heating consumption by 30 to 40%, running at full capacity through Bergen's coldest winter in 20 years.
HealthcareOslo University Hospital
Three units, field COP 3.2, around 105 tonnes of CO₂ avoided per year.
IndustryStatkraft, Meråker
Three units in a greenhouse, COP 5.4, around 750 tonnes of CO₂ avoided per year.
AquacultureNekton Aquaculture
One unit delivering 85°C heat from seawater, COP 3.25, around 35 tonnes of CO₂ avoided per year.