Indoor swimming pool with water slides reflected in the water
Public buildings

AdO Arena

AdO Arena is Norway's national swimming arena in Bergen, a 12,000 m² facility named after Olympic swimmer Aleksander Dale Oen and opened in 2014. Straume Rør installed a Tequs Aqua4 CO₂ heat pump for pool heating that replaced an originally specified propane system. It is expected to deliver over 1.1 GWh of heat a year and save up to 750,000 kWh of energy annually.

Bergen, Norway
Location
140 kW (Aqua4)
Installed Capacity
2.7
Field COP
~35 t/yr
CO₂ Avoided

From fossil to renewable

With Tequs' Aqua series heat pumps, AdO Arena has replaced traditional fossil-fuelled pool heating with a CO₂ heat pump solution. The system delivers water up to 90°C and is used here for pool heating. CO₂ (R744) as a refrigerant has a Global Warming Potential (GWP) of just 1, making it one of the most climate-friendly alternatives on the market. Tequs is also the world's first manufacturer to achieve EcoDesign certification for a high-temperature CO₂ heat pump.

Tailored for Norway's largest aquatic centre

Tequs' modular design allows multiple units to be connected in parallel for capacities up to 2.8 MW. For AdO Arena, this means the flexibility to scale with seasonal demand, from everyday public bathing to major international competitions. The compact footprint, with widths from just 698 mm, made installation possible even in the arena's confined technical rooms.

Dedicated to pool heating

At AdO Arena the heat pump keeps the main pool at 28°C and the hot pool at 37°C. The system achieves a COP of 2 to 6, dramatically reducing energy costs compared to conventional solutions.

Bergen Municipality
Our ambition was to maximize local energy production through solar power. By combining hybrid solar panels with Tequs’ heat pump technology, we now produce 1.4 GWh annually, exceeding our original target by 35%.

Technical solution

ParameterDetail
Heat pump model
Aqua4
Refrigerant
CO₂ (R744), replacing an originally specified propane system
System temperatures
70 / 45 °C
Application
Pool heating for a public swimming arena

Results and impact

  • 2.82: Lab-verified COP (Rivacold, EN 14511)
  • 2.7: Field COP, within 5% of lab result
  • 91.2%: Days at full capacity through Bergen's coldest winter in 20 years
  • Over 1.1 GWh/yr: Expected heat delivered for pool heating, vs. 575 MWh planned
  • Up to 750,000 kWh/yr: Expected energy savings
  • 1.4 GWh/yr: Produced via hybrid solar and heat pump, 35% above target

References.

Indoor swimming pool with water slides reflected in the waterPublic buildings

AdO Arena

Pool heating saving up to 750,000 kWh a year, running at full capacity through Bergen's coldest winter in 20 years.

Green plants under the glass roof of a greenhouseIndustry

Statkraft, Meråker

Three units in a greenhouse, COP 4.8, around 750 tonnes of CO₂ avoided per year.

Hotel room with curtains and a window facing the fjordHospitality

Holmen Fjordhotell

One unit supplying space heating and hot water for 170 rooms, saving around 191,000 kWh a year.

Fjord with a land-based aquaculture facility by the shoreAquaculture

Nekton Aquaculture

One unit delivering 85°C heat from seawater, COP 3.25, around 35 tonnes of CO₂ avoided per year.